Monday 30 September 2024

Infrastructure 2024 to 2025

 

Above is Avalon's (Plot 1 & 1A) layout for 2024, ignoring what was supposed to be planted in what bed if basically shows the bed layout and locations of Daleks etc. 

Below is what I'm aiming to achieve by March 2025


Below is what I'm aiming to achieve by March 2025. The tumbling and non uniform Daleks are to be replaced with standard green door less Daleks and more are to be added to the line of Daleks along the path between plots 1 & 1A and plot 2.

A Blueberry and Goji Berry area is to be added to the rear of the corner Climbing Frame Greenhouse. I'm also considering where to locate 3 new pixie grape plants, either down on the allotment or at home.  

Beds 12,13,14, 16 and 17 are to be formed from just above ground level framed 2.4m x 0.8m beds to 1.2m x 0.8m Raised beds approx. 400mm high at either end with a new path between.

I have been working on doing this at bed 16 in the last couple of months. 

I'm also considering moving the external potting bench behind the plot 1 greenhouse out against the wall by the potting shed and replacing the 1.8m x 1.2m (6ft x 4ft) greenhouse with a 1.8m x 2.4m (6ft x 8ft) entry level greenhouse with the door onto the main path from plot 1 to plot 1A. 

No comments:

Post a Comment