Mega hot and sunny today so just a couple of hours on the allotment to work on the path between the two raised beds at either end of what was bed 16. The path is constructed using some of the paving slabs I picked up in the last couple of weeks from Freecycle.

Next work on the bed to excavate the soil out of the bed on the left into square flower buckets and then re fill with branches and woodchips up to the top of the first level of timbers.