Friday 24 March 2023

Measuring Out Plots

 


This morning I met up with Jane from idverde and we measured out plots 11 & 11A because the previous tenant did a land grab taking quite a slice of plot 11, they are now equal in size.

We are still pursuing a solution to the removal of all the debris from plots 11, 11A & 3A by the council and idverde. The council have asked once again for a costing to remove all the debris, despite Adam Brind already previously agreeing the cost of the skips. Now idverde & Veolia need to also price up their element. I'm not holding my breath, but have told Jane I will hold back on taking matters further, for a short while and pointed out the welding oxy acetylene and oxygen cylinders and torch etc again to her.

Plot 9 & 9A which has had eight foot of brambles removed, may or may not still have Japanese Knotweed was also measured and pegged out as two half plots. If when inspected in a few months time there is no further signs of Japanese Knotweed then these plots will get new plot holders from the waiting list which now stands at 40.

Finally some fencing and signs will be forthcoming for plot 9 which should have been in place for all the years this plot has been out of action and undergoing treatment. With the plot belong so overgrown and inaccessible for so long, and the hit and miss treatment over the years, the likelihood of it actually being clear of Japanese Knotweed is very remote.

At least idverde have bitten the bullet and sub contacted the Knotweed treatment out now to a company that knows what they are doing and has the training and resources. I'm assuming that the fencing will not go up until they come to inspect once the growing season is underway.

An invite has been sent to the first person on the waiting list to contact me & come and view Plot 4.

I managed to have a little tidy up on Plot 1 and to sort out the pebble pool and measure for the weed membrane to go under the plastic former. I sowed radishes into the raised planter that is beside the plot 1 greenhouse.

The heavens opened up and I took refuge in the plot 1 greenhouse and was decanting coffee grounds into tins to dry out, until the rain slowed down and I could make a dash for the car. I'm so looking forward to having a 6ft x 8ft potting shed to work in when the weather is not so kind in future.


It's been way to wet cold and windy to cut the weed membrane in the back garden, so tonight I set up the scaffold board in the living room between two fold up tables.

The new 50m roll I bought was supposed to be 1.2m wide but in fact is 1.22m or 4ft. At least now I have finished the 2m wide roll up I only need to cut the roll into 2.4m long sheets to fit the standard beds. I will get 20 sheets out of the roll, tonight I measured and cut 5 and looking at the weather forecast, I may get the other 15 processed on Sunday.

I need some winter blanks and the others once processed will have holes burnt out of them and be turned into planting membrane.

No comments: