Saturday, 1 February 2025

Timber Dropped off To Plot


Timber unloaded and stacked on a bed.


Then covered over to keep it dry until I need it.


Woodchip has consolidated in the base layer of the current raised bed I'm constructing, due to the large amount of rain we have had.


A wheel barrow load of woodchip topped it up again.


View of bed 15 and the Asparagus bed to the right. I still need to go back and finished stripping the first Raspberry bed of bind weed and mulch it, but mentally I need to see some real progress working up the plot. 


View Up the allotment.


I gathered rotting timber and branches and have stacked them on the completed Bed 15 raised bed, ready for the bottom layer of the next raised bed.


The 2.4m x 1.2m bed 16 that will be converted into two raised beds, was cleared of items this morning, the bed needs to be unscrewed and converted into a second level for the narrow bed behind in this photograph.

No comments:

Post a Comment