Saturday, 2 May 2026

Boards & Drainage Pipes

A trip to the allotment this morning but it was way to hot and sunny to stay very long, I harvested another batch of scaffold boards and cut two foot lengths of 4" (100mm) Drainage pipes to be turned into worm towers. 

I had intended to get more square buckets of woodchips for the third bed at home, but the heat and exhaustion from humping the scaffold boards meant I will leave it until my next allotment visit. 

My 5 x 70mm T20 countersunk headed screws had finally come into Toolstation so I went to collect them so that I could get the other 3ft (900mm) scaffold boards cut square, drilled and screwed ready for assembly into raise bed frames.  

No comments:

Post a Comment