A good afternoons work on the allotment yesterday, the triangular path next to the boundary beds and the winter Raspberries was cleared levelled and then weed membraned and the dry woodchips on top of the pile skimmed off and laid. Gradually working my way into the mesh covered Greenhouse frame corner of the plot.
Wood chip off the top of the pile for the path. "Thing" was there to give me a hand!
More buckets of soil were processed and added to the Boundary beds. Lots of wood offcuts and tree cuttings were burnt. The asparagus bed has had a first level weeding, I'm left with some long dandelions to remove next visit.
No comments:
Post a Comment