After a week of man flu and rain, I did manage to get down to the
allotment for a few hours this Sunday morning, which cheered me up no end, it
was very cold but sunny and dry, I can do cold, I have no problem with cold, if
you are working you generate heat but wet that's a whole different ball game, I
don't do wet.
I worked on shifting the blue pipe off bed 8 and stacking behind the greenhouse. I intend to mount some brackets on the wall behind the new shed on plot 1 and stack the blue pipe there once the shed has been moved over. The tarp that was over the path between beds 8&9 was removed, covered with weed membrane and paving slabs laid.
The plastic bed edging was dug up and the decking board timber bed edging was screwed together. The bed re-dug which as it's not walked upon and spuds were dug out of it last year was no problem.
Finally
the weed membrane and a couple of paving slabs either end of the path between
bed 7 & 8 was laid. The climbing frames for the cucumbers on bed 7 were
dismantled and stacked against the greenhouse.
I need to get the new bed frames and the paths covered on Plot 1A ready for the
growing season as much as I need to get the shed and greenhouse area of Plot 1
ready, the weather combined with personal and working commitments are limiting
the time I'm able to give to the tasks.
Not as many hours on a Sunday as I would like on the plot, but little and often
works as long as it is often, and that's something I need to arrange better. I
just need to have in my mind that forward Is still forward no matter how slow
the steps are or seem to be.
No comments:
Post a Comment