Monday, 28 January 2013

Sunday 27th January 2013




Just like the BBC forecast said rain until 9:00 in the morning until 2:00 when there was a shower of rain and Jen and I had had enough by then. We cut up the material under pile 4 and place in drying bin 3 for it to dry out more ready for another burn up. 

We had a clean up and came away with four bags of rubbish for the dump, and the roses. Talking to Andy he suggested putting them in pots until I can clear the places where they are going to live. (good idea so I've done that this afternoon at home). 

Picked up some pots from the garden centre on the way home, and could not resist cheap chicken poop and some more seeds, the missing celery and some sweetcorn (not on the plan but something that really grows well on our site I'm informed).

Plcture below looking up to the shed. Two newly constructed leaf bins on the left, with all the bags of leafs behind until I can clear where the leaf bins are going to end up.  

The yellow lines that go up to the shed will be the path down the centre of the plot

No comments:

Post a Comment