Left Photo View looking down the plot towards the entrance on the Main Path. It will make it easier to get all the woodchip up here to surround the Dalek that is to be installed in the excavation being dug out on the left.
Right Photo View looking up plot 1A from plot 1 on the Main Path. I still need to tweak the sloping section between plot 1 & 1A
After yesterdays rain and high winds, I'm happy to report the plot 1 greenhouse loft conversion is still standing (just). As everything was wet on the allotment I decided to work on relaying the main path on plot 1A.
Damp woodchip is a bugger to shovel into a wheelbarrow, but it happened and so did laying the path all the way up to the overflow leaf bin entrance.
The two additional fox defenders were installed to cover additional entrances into my plots. No Robin was seen today and it was only Andy and myself on the plot this morning, one of the new plot holders popped in and out to collect something from his shed. I kinda expected to see a few more faces on the allotment today.
%20Path.jpeg)
No comments:
Post a Comment