I Bought nine number 2.4m long timber decking planks from Wicks as they are £3.99 at the moment and took them to plot 23B. Cut three of them in half and I now have the timber for the next 3 raised beds ready for after I have dug and weeded. Put down the Weed Membrane on the path between bed 2 and what will be Bed 3 before any weeds take hold.
Visited my local hardware shop and picked up the decking screws because they are cheaper than Wicks and I want to support the old fashioned hardware shop, plus I needed a number of hooks, eyebolts, angles and other items for projects in the pipe line.
No comments:
Post a Comment