Up early and on the plot at just past 7:00 -worked until 1:00 Andy. Michelle and Lee on the allotment as I left for home and Sunday lunch.
- Tidy the racking and storage area
- Weeded bed 2 and harvested the spring onions
- Planted out the over winter spring onions from the cold frame in Bed 2 and watered with comfrey tea
- Took the over winter cabbage from the cold frame but didn't get to plant it
- Harvested the peppers and the last of the toms
- Constructed the third plastic bottle 1.2 x 1.2 m frame
- Stacked all the pop bottles ready for frame 4
- Filled up the comfrey water barrel with extract from the comfrey pipe.
- Sorted out the shed
- General tidy of rubbish and retrieve the lids to the incinerator and the green dalek
No comments:
Post a Comment